![ABB HVC-C 100-150 kW Installation Manual Download Page 96](http://html.mh-extra.com/html/abb/hvc-c-100-150-kw/hvc-c-100-150-kw_installation-manual_2837984096.webp)
20.10.2
Control box (wall)
C
B
A
A
X1
Z1
A
Holes
B
Brackets installed horizontally
C
Brackets installed vertically
X1
Distance between the holes -
horizontal
Z1
Distance between the holes -
vertical
Note: Install all brackets either horizontally or vertically.
Table 6: With brackets installed horizontally
Parameter
Specification [mm]
X1
658,6
Z1
380
Table 7: With brackets installed vertically
Parameter
Specification [mm]
X1
530
Z1
508,6
Technical data
96
6AGA000007-0611-EN | 001