5.4
Install the control box - general procedure
Preliminary requirements
1.
The site is prepared.
Procedure
1. Unpack the control box. Refer to section
.
2. Do the mechanical installation of the control box. Refer to section
.
3. Do the electrical installation of the control box. Refer to section
Installation