Access to parts
18.1
Open the door of the power cabinet
Preliminary requirements
•
Door key of the power cabinet
Danger:
Hazardous voltage
•
Make sure that only qualified personnel has access to the door key.
Note: There is one unique door key for each power cabinet.
Procedure
1. Unlock the lock (A) of the door (B). Use
the door key.
2. Open the door.
18.2
Close the door of the power cabinet
Preliminary requirements
•
Door key to the power cabinet.
Danger:
Hazardous voltage
•
Make sure that only qualified personnel has access to the door key.
Note: There is one unique door key for each cabinet.
B
A