![ABB HVC-C 100-150 kW Installation Manual Download Page 76](http://html.mh-extra.com/html/abb/hvc-c-100-150-kw/hvc-c-100-150-kw_installation-manual_2837984076.webp)
Electrical installation of the control box
15.11 Connect the CCS control cable from the cable reel CR
Preliminary requirements
a. X4-2 (N) CCS Temp1_2 to cable reel
b. X4-5 (P) CCS_CP to cable reel
c. X4-6 (O) CCS_CP to cable reel
d. X4-7 (Q) CCS Temp1_1 to cable reel
e. X4-8 (R) CCS Temp2_1 to cable reel
f. X4-9 (S) CCS Temp2_2 to cable reel
N
O
P
Q
R
S
Procedure
1. Strip the insulation from the
cable. For the specification,
refer to section
20.12.12
.
2. Prepare the wires:
a. Twist the shield mesh.
b. Strip the wires.
For the specification, refer
to section
20.12.12
.
3. Make sure that any unused wires
are insulated and cannot touch
metal parts.
4. Loosen the screws on the terminals:
(N), (O), (P), (Q), (R), (S).
5. Connect these wires:
6. Tighten the screws to the correct torque. For the specification, refer to section
20.5
.
76
6AGA000007-0611-EN | 001