![ABB HVC-C 100-150 kW Installation Manual Download Page 88](http://html.mh-extra.com/html/abb/hvc-c-100-150-kw/hvc-c-100-150-kw_installation-manual_2837984088.webp)
20.3
Required tools for installation
Tool
Specification
Hoisting equipment or forklift truck
Capable to lift the EVSE safely. Take into ac-
count the dimensions, weight and the maxi-
mum tilt angle. Refer to different sections
in this document.
Swivel eye bolts or bolts with lifting
loops (to use with hoisting equip-
ment)
Thread M10
Torx keys
Size: 25
Open spanners
Size: M5 (8mm), M6 (10 mm), M8 (13 mm),
M10 (15 mm), M12 (19 mm) and M16 (24 mm)
Torque wrenches
Size: M5 (8mm), M6 (10 mm), M8 (13 mm),
M10 (15 mm), M12 (19 mm), M16 (24 mm)
and M20 (30 mm)
Screwdrivers
Size: 2.5 mm, 5 mm, and 5.5 mm
Torque screwdrivers
Size: 2.5 mm, 5 mm, and 5 mm
Wire cutter
Standard
Crimp pliers
Standard
Wire stripper pliers
Standard
20.4
Transport specifications
Parameter
Specification
Maximum tilt angle during transport
30°
20.5
Torque specifications
Table 2: Torque specifications for fasteners
Parameter
Specification [Nm][(lb.in.)]
Power cabinet, nuts on PE busbars
30 (265.52)
Power cabinet, nuts on the AC power
busbars
30 (265.52)
Power cabinet, screws in the X-8 termi-
nal block
1.3 (11.5)
Power cabinet, nuts on the DC power
busbars
30 (265.52)
Power supply box, screws in the X1 ter-
minal blocks
1.3 (11.5)
Control box, nuts on the DC power bus-
bars
30 (265.52)
Control box,screws in the X1 and X4 ter-
minal blocks
1.3 (11.5)
Technical data
88
6AGA000007-0611-EN | 001