56 / 121
User Manual 3000SP
Rev. 1.1 16/03/2021
Identification: MD-AL-GI-00
Rev. 1.1 of 16/03/2021 - Application: GID
When the battery is fully charged (or when the
charging power is limited), the excess energy will be
exported to the grid.
When the energy from the photovoltaic system is once
again lower than that requested by the loads, the
system will give priority to the energy stored in the
battery.
When the sum of the energy produced by the
photovoltaic system and supplied by the battery is less
than that required by the loads, the missing energy will
be taken from the grid.
Press the “Down” key from the main menu to access the
instantaneous information on the operation of the
3000SP.
Below are the instantaneous information and values that can be seen by pressing the “Down” key
from the main interface.
Grid (V)
Indicates the voltage of the grid in Volts
Grid (A)
Indicates the current exchanged with the grid in Ampere (the symbol – in
front of the figure indicates a transfer of power to the grid)
Frequency
Indicates the frequency of the grid expressed in Hertz