8.
Verification of proper functioning
To check the proper functioning of the inverter, follow these steps:
1.
Switch of all photovoltaic generation sources.
2.
Lower the circuit breaker switch dedicated to protecting the 3000SP, the inverter will remain
switched on but will go into error due to no alternating power.
3.
Power up the 3000SP by pulling on the AC switch.