24 / 121
User Manual 3000SP
Rev. 1.1 16/03/2021
Identification: MD-AL-GI-00
Rev. 1.1 of 16/03/2021 - Application: GID
Figure 14 - Connecting the communication cable between three Pylontech batteries
NOTE:
the position of the DIP switches (white on a red background, as shown in the figure below) should
not be changed. If it is changed by accident, contact the ZCS Service Centre at the toll-free number 800 72 74
64 (available on in Italy) or open a ticket by going to the support section of our website:
https://www.zcsazzurro.com/it/support
4.3.
Connecting a WeCo battery
4.3.1.
Connecting a single battery
This cable must be connected to the battery by inserting the RJ45 (8 pin) plug into the appropriate
connection:
a.
In the case of WeCo batteries, insert the plug into the BMS CAN port of the single battery.
Figure 15 - Communication cable between the inverter and WeCo battery