19
EN_40_070_0011I | Service Manual | Lamp replacement and calibration - Corona extreme
Replacing the halogen lamp
Lamp Replacement and Calibration Corona extreme
1
Exit control software
Exit the
InProcess
control software.
2
Disconnect power supply
Disconnect the power supply to the
Corona extreme
measuring system.
3
Dismantle Corona extreme from customer interface
If necessary, dismantle the
Corona extreme
measuring system from the
customer interface (tool selection based on specific constellation).
4
Remove system cables
Loosen the sleeve nuts of the connected plugs and remove the cables from the
connection sockets on the
Corona extreme
measuring system.
5
Set up ESD workstation
Perform all the activities described below at an ESD workstation.
6
Have the spare parts ready
If you have not already done so, have the following spare parts ready:
– Maintenance Package 1, order no. 000000-2397-831
– Maintenance Package 2, order no. 000000-2397-832
– Maintenance Package 3, order no. 000000-2402-119
7
Have all tools and equipment ready
If you have not already done so, have the following tools and equipment ready:
– TX 10 and TX 25 Torx screwdrivers
– 2 mm slot-head screwdriver
– Gloves
Procedure
Hardware revision 1:
Hardware revision 2:
Hardware revision 3: