4 - 100
ENG
CRANKCASE AND CRANKSHAFT
6. Tighten:
• Hose guide
1
• Clutch cable holder
2
• Bolt (crankcase)
3
NOTE:
Tighten the crankcase tightening bolts in
stage, using a crisscross pattern.
T
R
.
.
12 Nm (1.2 m · kg, 8.7 ft · lb)
7. Install:
• Oil delivery pipe 2
1
• O-ring
2
• Bolt (oil delivery pipe 2)
3
NOTE:
Apply the lithium soap base grease on the O-
rings.
T
R
.
.
10 Nm (1.0 m · kg, 7.2 ft · lb)
New
8. Install:
• Timing chain
1
• Timing chain guide (intake side)
2
• Bolt (timing chain guide)
3
9. Remove:
• Sealant
Forced out on the cylinder mating sur-
face.
10. Apply:
• Engine oil
To the crank pin, bearing and oil delivery
hole.
11. Check:
• Crankshaft and transmission operation.
Unsmooth operation
→
Repair.
T
R
.
.
10 Nm (1.0 m · kg, 7.2 ft · lb)
www.PlanDeGraissage.org
Содержание WR250FR 2002
Страница 1: ...LIT 11626 16 48 WR250FR 5UM 28199 10 OWNER S SERVICE MANUAL www PlanDeGraissage org...
Страница 2: ...www PlanDeGraissage org...
Страница 5: ...www PlanDeGraissage org...
Страница 12: ...MEMO www PlanDeGraissage org...
Страница 118: ...3 53 INSP ADJ BATTERY INSPECTION AND CHARGING Charging method using a variable voltage charger www PlanDeGraissage org...
Страница 119: ...3 54 INSP ADJ BATTERY INSPECTION AND CHARGING Charging method using a constant voltage charger www PlanDeGraissage org...
Страница 143: ...4 21 ENG 9 Install Clamp 1 Refer to CABLE ROUTING DIAGRAM section in the CHAPTER 2 1 CARBURETOR www PlanDeGraissage org...