6 - 12
–
+
ELEC
ELECTRIC STARTING SYSTEM
DIODE INSPECTION
1. Remove the diode from wire harness.
2. Inspect:
• Diode continuity
Use pocket tester
(tester selection position
Ω
×
1)
Incorrect continuity
→
Replace.
Tester (+)
→
Blue/Red terminal
1
Tester (–)
→
Sky blue terminal
2
Continuous
Tester (+)
→
Blue/Red terminal
1
Tester (–)
→
Blue/Yellow terminal
3
Continuous
Tester (+)
→
Sky blue terminal
2
Tester (–)
→
Blue/Red terminal
1
No
continuous
Tester (+)
→
Blue/Yellow terminal
3
Tester (–)
→
Blue/Red terminal
1
No
continuous
2
3
1
START SWITCH INSPECTION
1. Inspect:
• Start switch continuity
No continuous while being pushed
→
Replace.
Continuous while being freed
→
Replace.
2. Inspect:
• Rubber part
a
Tears/damage
→
Replace.
Tester (+) lead
→
Black lead
1
Tester (–) lead
→
Black lead
2
B
1
B
2
Tester selector
position
PUSH IN
Ω
×
1
FREE
a
www.PlanDeGraissage.org
Содержание WR250FR 2002
Страница 1: ...LIT 11626 16 48 WR250FR 5UM 28199 10 OWNER S SERVICE MANUAL www PlanDeGraissage org...
Страница 2: ...www PlanDeGraissage org...
Страница 5: ...www PlanDeGraissage org...
Страница 12: ...MEMO www PlanDeGraissage org...
Страница 118: ...3 53 INSP ADJ BATTERY INSPECTION AND CHARGING Charging method using a variable voltage charger www PlanDeGraissage org...
Страница 119: ...3 54 INSP ADJ BATTERY INSPECTION AND CHARGING Charging method using a constant voltage charger www PlanDeGraissage org...
Страница 143: ...4 21 ENG 9 Install Clamp 1 Refer to CABLE ROUTING DIAGRAM section in the CHAPTER 2 1 CARBURETOR www PlanDeGraissage org...