
4 - 83
ENG
AC MAGNETO AND STARTER CLUTCH
2. Install:
• Holder
1
• Bolt
2
CAUTION:
Pass the pickup coil lead and charging coil
lead under the holder while taking care not
to allow these leads to get caught with each
other. Also take care to pass the leads so
that they do not become loose at the bend
of the holder
a
in order to avoid their con-
tacting the starter clutch drive gear.
NOTE:
Apply the sealant to the grommet of the AC
magneto lead.
T
R
.
.
7 Nm (0.7 m · kg, 5.1 ft · lb)
Quick gasket
®
:
ACC-QUICK-GS-KT
YAMAHA Bond No. 1215:
90890-85505
1
2
a
3. Install:
• Idle gear 2
1
• Dowel pin
2
NOTE:
Apply the engine oil on the idle gear 2.
2
1
2
E
4. Install:
• Idle gear plate
1
• Bolt (idle gear plate)
2
T
R
.
.
10 Nm (1.0 m · kg, 7.2 ft · lb)
1
2
www.PlanDeGraissage.org
Содержание WR250FR 2002
Страница 1: ...LIT 11626 16 48 WR250FR 5UM 28199 10 OWNER S SERVICE MANUAL www PlanDeGraissage org...
Страница 2: ...www PlanDeGraissage org...
Страница 5: ...www PlanDeGraissage org...
Страница 12: ...MEMO www PlanDeGraissage org...
Страница 118: ...3 53 INSP ADJ BATTERY INSPECTION AND CHARGING Charging method using a variable voltage charger www PlanDeGraissage org...
Страница 119: ...3 54 INSP ADJ BATTERY INSPECTION AND CHARGING Charging method using a constant voltage charger www PlanDeGraissage org...
Страница 143: ...4 21 ENG 9 Install Clamp 1 Refer to CABLE ROUTING DIAGRAM section in the CHAPTER 2 1 CARBURETOR www PlanDeGraissage org...