
6 - 18
–
+
ELEC
CHARGING SYSTEM
EC624000
COUPLERS AND LEADS CONNECTION
INSPECTION
1. Check:
• Couplers and leads connection
Rust/dust/looseness/short-circuit
→
Repair or replace.
CHARGING VOLTAGE INSPECTION
1. Start the engine.
2. Inspect:
• Charging voltage
Out of specification
→
If no failure is
found in checking the source coil resis-
tance, replace the rectifier/regulator.
Tester (+) lead
→
Red lead
1
Tester (–) lead
→
Black lead
2
Charging
voltage
Tester selector
position
14.1 ~ 14.9 V at
5,000 r/min
DCV-20
R
B
W
Y
1
2
3. Inspect:
• Charging coil resistance
Out of specification
→
Replace.
Tester (+) lead
→
White lead
1
Tester (–) lead
→
Ground
2
Charging coil
resistance
Tester selector
position
0.288 ~ 0.432
Ω
at
20 °C (68 °F)
Ω
×
1
www.PlanDeGraissage.org
Содержание WR250FR 2002
Страница 1: ...LIT 11626 16 48 WR250FR 5UM 28199 10 OWNER S SERVICE MANUAL www PlanDeGraissage org...
Страница 2: ...www PlanDeGraissage org...
Страница 5: ...www PlanDeGraissage org...
Страница 12: ...MEMO www PlanDeGraissage org...
Страница 118: ...3 53 INSP ADJ BATTERY INSPECTION AND CHARGING Charging method using a variable voltage charger www PlanDeGraissage org...
Страница 119: ...3 54 INSP ADJ BATTERY INSPECTION AND CHARGING Charging method using a constant voltage charger www PlanDeGraissage org...
Страница 143: ...4 21 ENG 9 Install Clamp 1 Refer to CABLE ROUTING DIAGRAM section in the CHAPTER 2 1 CARBURETOR www PlanDeGraissage org...