6 - 5
–
+
ELEC
IGNITION SYSTEM
2. Inspect:
• Rubber part
a
Tears/damage
→
Replace.
a
MAIN SWITCH INSPECTION
1. Inspect:
• Main switch conduct
Continuous while the main switch is moved to
“OFF”
→
Replace.
Not continuous while the main switch is moved
to “ON”
→
Replace.
Tester (+) lead
→
Red lead
1
Tester (–) lead
→
Brown lead
2
R
1
Br
2
Tester selector
position
ON
Ω
×
1
OFF
2. Inspect:
• Main switch indicator light
Use 12 V battery.
Indicator light does not come on
→
Replace.
Battery (+) lead
→
Red/Black lead
1
Battery (–) lead
→
Black lead
2
3. Inspect:
• Rubber part
a
Tears/damage
→
Replace.
a
www.PlanDeGraissage.org
Содержание WR250FR 2002
Страница 1: ...LIT 11626 16 48 WR250FR 5UM 28199 10 OWNER S SERVICE MANUAL www PlanDeGraissage org...
Страница 2: ...www PlanDeGraissage org...
Страница 5: ...www PlanDeGraissage org...
Страница 12: ...MEMO www PlanDeGraissage org...
Страница 118: ...3 53 INSP ADJ BATTERY INSPECTION AND CHARGING Charging method using a variable voltage charger www PlanDeGraissage org...
Страница 119: ...3 54 INSP ADJ BATTERY INSPECTION AND CHARGING Charging method using a constant voltage charger www PlanDeGraissage org...
Страница 143: ...4 21 ENG 9 Install Clamp 1 Refer to CABLE ROUTING DIAGRAM section in the CHAPTER 2 1 CARBURETOR www PlanDeGraissage org...