
5 - 45
CHAS
HANDLEBAR
11. Install:
• Clutch cable
1
• Hot starter cable
2
NOTE:
Apply the lithium soap base grease on the
clutch cable end and hot starter cable end.
12. Adjust:
• Clutch lever free play
Refer to “CLUTCH ADJUSTMENT” sec-
tion in the CHAPTER 3.
• Hot starter lever free play
Refer to “HOT STARTER LEVER
ADJUSTMENT” section in the CHAPTER
3.
13. Fasten the hot starter cable
1
and clutch
cable
2
with a clamp
3
.
1
2
3
14. Insert the end of the fuel breather hose
1
into the hole in the steering stem cap
2
.
1
2
www.PlanDeGraissage.org
Содержание WR250FR 2002
Страница 1: ...LIT 11626 16 48 WR250FR 5UM 28199 10 OWNER S SERVICE MANUAL www PlanDeGraissage org...
Страница 2: ...www PlanDeGraissage org...
Страница 5: ...www PlanDeGraissage org...
Страница 12: ...MEMO www PlanDeGraissage org...
Страница 118: ...3 53 INSP ADJ BATTERY INSPECTION AND CHARGING Charging method using a variable voltage charger www PlanDeGraissage org...
Страница 119: ...3 54 INSP ADJ BATTERY INSPECTION AND CHARGING Charging method using a constant voltage charger www PlanDeGraissage org...
Страница 143: ...4 21 ENG 9 Install Clamp 1 Refer to CABLE ROUTING DIAGRAM section in the CHAPTER 2 1 CARBURETOR www PlanDeGraissage org...