2 - 25
SPEC
CABLE ROUTING DIAGRAM
Ì
Fasten the coolant reservoir breather hose and
carburetor breather hoses together.
Í
Fasten the CDI unit lead.
Î
Insert the CDI unit band over the CDI unit stay as
far as possible.
Ï
Fasten the rectifier/regulator lead to the rectifier/
regulator bracket with a plastic locking tie and cut
off the tie end.
www.PlanDeGraissage.org
Содержание WR250FR 2002
Страница 1: ...LIT 11626 16 48 WR250FR 5UM 28199 10 OWNER S SERVICE MANUAL www PlanDeGraissage org...
Страница 2: ...www PlanDeGraissage org...
Страница 5: ...www PlanDeGraissage org...
Страница 12: ...MEMO www PlanDeGraissage org...
Страница 118: ...3 53 INSP ADJ BATTERY INSPECTION AND CHARGING Charging method using a variable voltage charger www PlanDeGraissage org...
Страница 119: ...3 54 INSP ADJ BATTERY INSPECTION AND CHARGING Charging method using a constant voltage charger www PlanDeGraissage org...
Страница 143: ...4 21 ENG 9 Install Clamp 1 Refer to CABLE ROUTING DIAGRAM section in the CHAPTER 2 1 CARBURETOR www PlanDeGraissage org...