5 - 32
CHAS
Front fork cap bolt
1. Inspect:
• Front fork cap bolt
1
• O-ring
2
• Air bleed screw
3
Wear/damage
→
Replace.
EC555000
ASSEMBLY AND INSTALLATION
Front fork assembly
1. Wash the all parts in a clean solvent.
2. Install:
• Damper rod
1
To inner tube
2
.
CAUTION:
To install the damper rod into the inner
tube, hold the inner tube aslant. If the inner
tube is held vertically, the damper rod may
fall into it, damaging the valve inside.
3. Install:
• Copper washer
1
• O-ring
2
• Base valve
3
To inner tube
4
.
New
4. Tighten:
• Base valve
1
NOTE:
• Use a damper rod holder
2
to lock the
damper rod
3
.
• Apply the LOCTITE
®
on the base valve
thread.
T
R
.
.
55 Nm (5.5 m · kg, 40 ft · lb)
Damper rod holder:
YM-1423/90890-01423
FRONT FORK
www.PlanDeGraissage.org
Содержание WR250FR 2002
Страница 1: ...LIT 11626 16 48 WR250FR 5UM 28199 10 OWNER S SERVICE MANUAL www PlanDeGraissage org...
Страница 2: ...www PlanDeGraissage org...
Страница 5: ...www PlanDeGraissage org...
Страница 12: ...MEMO www PlanDeGraissage org...
Страница 118: ...3 53 INSP ADJ BATTERY INSPECTION AND CHARGING Charging method using a variable voltage charger www PlanDeGraissage org...
Страница 119: ...3 54 INSP ADJ BATTERY INSPECTION AND CHARGING Charging method using a constant voltage charger www PlanDeGraissage org...
Страница 143: ...4 21 ENG 9 Install Clamp 1 Refer to CABLE ROUTING DIAGRAM section in the CHAPTER 2 1 CARBURETOR www PlanDeGraissage org...