4 - 73
ENG
TRANSMISSION, SHIFT CAM AND SHIFT FORK
TRANSMISSION, SHIFT CAM AND SHIFT FORK
Extent of removal:
1
Shift cam and shift fork removal
2
Main axle and drive axle removal
Extent of removal
Order
Part name
Q’ty
Remarks
TRANSMISSION, SHIFTCAM
AND SHIFT FORK REMOVAL
Preparation for removal
Engine
Refer to “ENGINE REMOVAL” section.
Separate the crankcase.
Refer to “CRANKCASE, CRANKSHAFT
AND BALANCER” section.
1
Shift fork guide bar 1 (short)
1
2
Shift fork guide bar 2 (long)
1
3
Shift cam
1
4
Shift fork 2 (C)
1
5
Shift fork 3 (R)
1
6
Shift fork 1 (L)
1
7
Main axle
1
Refer to “REMOVAL POINTS”.
8
Drive axle
1
9
Push rod 2
1
10
Washer
1
1
2
Содержание TT-R125LW
Страница 22: ...INDEX GENERAL INFORMATION SPECIFICATIONS REGULAR INSPECTION AND ADJUSTMENT ENGINE CHASSIS ELECTRICAL ...
Страница 47: ...GEN INFO MEMO ...
Страница 63: ...GEN INFO MEMO ...
Страница 78: ...SPEC 2 11 MAINTENANCE SPECIFICATIONS Cylinder head tightening sequence ...
Страница 95: ...SPEC 2 11 CARACTÉRISTIQUES D ENTRETIEN Ordre de serrage de la culasse ...
Страница 112: ...SPEC 2 11 WARTUNGSDATEN Anzugsreihenfolge Zylinderkopfschrauben ...
Страница 119: ...SPEC MEMO ...
Страница 135: ...INSP ADJ MEMO ...
Страница 230: ...4 23 ENG CAMSHAFT AND ROCKER ARMS 5 Install Camshaft bearing holder 1 Bolt 2 T R 10 Nm 1 0 m kg 7 2 ft lb LT ...
Страница 461: ... ELEC MEMO ...
Страница 468: ...PRINTED IN JAPAN 00 1 2 1 1 CR PRINTED ON RECYCLED PAPER YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...