2 - 19
SPEC
CABLE ROUTING DIAGRAM
1
Air vent hose
2
Spark plug lead
3
Starter cable
4
Throttle cable
5
Clutch cable
6
Clamp
7
Cable guide
8
Engine oil breather hose
9
Overflow hose
Å
After clamping the starter cable, push it against the starter plunger.
ı
Put the tip of the air vent hose into the main pipe.
Ç
Install the primary coil terminal (orange) to the ignition coil.
Î
Fasten the ground lead together with the ignition coil.
‰
Pass the clutch cable on the inside of the throttle and starter cable.
Ï
Clamp the clutch cable with the paint in the cable guide bottom recess.
Ì
Pass the throttle cable and starter cable into the cable guide.
Ó
Pass the engine oil breather hose and overflow hose between the right
half of the swingarm and pillar tube.
È
Clamp the engine oil breather hose, overflow hose and air vent hose to
2 clicks.
Содержание TT-R125LW
Страница 22: ...INDEX GENERAL INFORMATION SPECIFICATIONS REGULAR INSPECTION AND ADJUSTMENT ENGINE CHASSIS ELECTRICAL ...
Страница 47: ...GEN INFO MEMO ...
Страница 63: ...GEN INFO MEMO ...
Страница 78: ...SPEC 2 11 MAINTENANCE SPECIFICATIONS Cylinder head tightening sequence ...
Страница 95: ...SPEC 2 11 CARACTÉRISTIQUES D ENTRETIEN Ordre de serrage de la culasse ...
Страница 112: ...SPEC 2 11 WARTUNGSDATEN Anzugsreihenfolge Zylinderkopfschrauben ...
Страница 119: ...SPEC MEMO ...
Страница 135: ...INSP ADJ MEMO ...
Страница 230: ...4 23 ENG CAMSHAFT AND ROCKER ARMS 5 Install Camshaft bearing holder 1 Bolt 2 T R 10 Nm 1 0 m kg 7 2 ft lb LT ...
Страница 461: ... ELEC MEMO ...
Страница 468: ...PRINTED IN JAPAN 00 1 2 1 1 CR PRINTED ON RECYCLED PAPER YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...