Commissioning
Alyza IQ NH4
68
ba76202d02
05/2020
2
Connect the intake line 2 to the filtration pump 2.
3
Connect the sample tubes to the overflow vessels.
The sample tube (channel 2) for overflow vessel 2 has a red labeling.
figure 3-29Opening for the sample tubes
1
Grooves for the sample tubes through the insulation of the measuring
unit
2
Connection of sample tube 1 (channel 1) to overflow vessel 1
3
Connection of sample tube 2 (channel 2) to overflow vessel 2
4
Carefully press the sample tubes into the grooves (1) left of the measur-
ing unit so that the sample tubes are not bent even when the front cover
is closed.
5
Install the collection funnel for the chemical waste.
6
If necessary, install the collection funnel for the sample overflow.
7
Insert the waste tube of the measuring unit into the collection funnel for
the chemical waste of the measuring unit.
1
3
2
Before opening:
ES: Antes de abrir:
Содержание YSI Alyza IQ NH4
Страница 168: ...Contact Information Alyza IQ 168 ba76202e02 05 2020...
Страница 169: ......