Alyza IQ NH4
Maintenance and cleaning
105
ba76202d02
05/2020
5.4
Overview of the maintenance and cleaning activities
Maintenance activities have to be done at regular intervals on the Alyza IQ.
The following maintenance activities can be performed by the operator.
Regular
maintenance
activities
Regular maintenance
Interval
Measuring unit
(simple mainte-
nance activities
on site)
Installing/replacing the
MultiPort valve (MPV)
Approx. 12 months
with a measuring interval of
10 min.
Depending on the fre-
quency of the measuring,
cleaning or calibrating pro-
cedures, the maintenance
intervals will be shorter or
longer (see section 5.5,
Installing / replacing the
ChemBags
Approx. 3 - 6 months (MR1),
approx. 1.5 - 3 months
(MR2),
depending on the frequency
of the measuring, cleaning
and calibration routines
(see section 5.5,
106)
Installing/replacing the
tubes on the MultiPort
valve (MPV)
12 - 24 months
(see section 5.5,
106)
Measuring unit
(complex main-
tenance activi-
ties in the labora-
tory, after remov-
ing the measur-
ing unit)
Installing / replacing the
syringe body
Approx. 2 years
(see mounting instructions
of the syringe body)
Installing / replacing the
tubes of the photometer
unit )
As necessary
(see mounting instructions
of the tubes of the photome-
ter unit)
Sample inlet,
outlet
Clean the overflow ves-
sel and intake line
As necessary
(see section 5.7.5,
Return line
As necessary
Waste tube of the mea-
suring unit
As necessary
Sample filtration
Sample filtration:
Cleaning the filter plate
(Filter/PC)
2 ... 4 months
depending on the applica-
tion.
If cleaning does not help
(see section 5.7.4,
Содержание YSI Alyza IQ NH4
Страница 168: ...Contact Information Alyza IQ 168 ba76202e02 05 2020...
Страница 169: ......