Alyza IQ NH4
Commissioning
61
ba76202d02
05/2020
Mounting
figure 3-25Collection funnel for the common discharging of all liquids
1
Heating line of the heat tracing
(attached to the fixing bracket with a cable tie)
2
Waste tube of the measuring unit
3
Sample overflow tube from the overflow vessel
4
Rubber cover of the collection funnel
(close any unused openings with plugs)
5
Cable ties
6
Fixing angle bracket
7
Collection funnel
8
Cable gland (2nd from the front)
9
Cable gland (in the front)
1
Insert the return line into the housing from the outside through the cable
gland (8). Inside, the end of the waste tube should be flush with the
cable gland (8).
Details on how to install the return lines and heat tracing lines:
see section 3.3.13 Connecting the power cable and heat tracing lines,
2
Fix the heat tracing (1) of the return line to the fixing angle bracket
behind the cable gland with the cable tie (scope of delivery: collection
funnel).
3
Insert the collection funnel (7) in the opening of the cable gland (8) in
the housing:
the beveled side of the collection funnel (7) points to the heat tracing
(1)
the drain of the collection funnel flows into the return line
4
Press the collection funnel down till it sits tight.
5
Pull the rubber cover (4) of the collection funnel over the edges of the
collection funnel.
The opening of the collection funnel has to be closed tightly.
1
3
2
4
5
6
9
8
7
Содержание YSI Alyza IQ NH4
Страница 168: ...Contact Information Alyza IQ 168 ba76202e02 05 2020...
Страница 169: ......