Alyza IQ NH4
140
ba76202d02
05/2020
5.11 Complex maintenance- and cleaning activities in the measur-
ing unit
For complex maintenance activities or cleaning activities in the measuring unit
we recommend that you dismount the measuring unit and transport it to a clean
laboratory environment.
When the measuring unit is dismounted, its parts are more easily accessible and
the environmental conditions (temperature, cleanliness) are more suitable for
complex maintenance activities or cleaning activities to be carried out.
5.11.1 Dismounting the measuring unit
1
Decommission the measuring unit of the Alyza IQ (see section 5.12
Decommissioning,
142).
2
Unscrew the 2 fixing screws of the cover lid of the control unit ACM and
remove the cover lid of the ACM.
3
Unplug the 2 cables from the switch box.
4
Unplug the 4 cables of the measuring unit from the control unit ACM and
let them hang to the front over the measuring unit.
figure 5-21Fixing the measuring unit
1
Front cover of the measuring unit
2
Fixation of the measuring unit to the cooling unit
3
Cooling unit
5
Using one hand, grip the handle at the upper edge of the front cover (1)
of the measuring unit.
6
Pull the front cover of the measuring unit somewhat to the front against
the resistance.
2
1
3
Содержание YSI Alyza IQ NH4
Страница 168: ...Contact Information Alyza IQ 168 ba76202e02 05 2020...
Страница 169: ......