Installation Procedure
Wiring Installation for Standard Sawmills
Installation Procedure
AS00doc032519
1-25
1
1.6
Wiring Installation for Standard Sawmills
1.
If your sawmill is equipped with a previous version Accuset option, skip to Final Assembly
(
IMPORTANT!
If you have a standard model sawmill, follow
the wiring installation instructions found in this section. If
you have a Super model sawmill, follow the wiring installa-
tion instructions found in
Section 1.5 Wiring Installation for
WARNING!
Before performing any service to the sawmill
control box panel, turn the key to the OFF position, discon-
nect the negative battery lead, and remove all rings,
watches, etc.... Failure to do so may cause serious injury
and machine damage.
2.
At the back of the up/down switch, locate the terminal with two orange wires connected
(TRM1 or TRM5). Leave the orange jumper wire connected and disconnect the orange
upper harness wire.
See Figure 1-22.
FIG. 1-22
3H0849-5
Orange Upper
Harness Wire
Leave Jumper
Wire In Place