![Wood-mizer Accuset Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/wood-mizer/accuset/accuset_safety-operation-maintenance-and-parts-manual_994535026.webp)
Installation Procedure
Wiring Installation for Super Sawmills
1
1-22
AS00doc032519
Installation Procedure
bottom solenoid. Be sure to leave the existing jumper wires in place. Reinstall the nuts.
NOTE:
If your up/down solenoid orientation is different than
shown, the solenoid panel may be installed upside down.
Rotate the panel 180°.
2.
Connect the black wire removed from bottom solenoid to the provided yellow (or black)
wire labeled MOTOR. Secure with the provided 1/4-20 x 3/8” screw, flat washer and
self-locking nut.
Connect the red wire removed from the top solenoid to the provided purple (or red) wire
labeled MOTOR. Secure with the provided 1/4-20 x 3/8” screw, washer and self-locking
nut.
Slide one end of the provided 6” piece of rubber tubing over each connection. Bend the
rubber tubing over to prevent connections from contacting each other and use a 6” wire
tie to secure the rubber tubing in place. Use a diagonal wire cutter
to remove the excess
ends of the wire tie.
See Figure 1-19.
FIG. 1-19
Rubber
Tubing
Screw
Self-Locking
Nut
Flat Washer
3H0344C