Installation Procedure
Sensor Installation (Rev. A.00)
Installation Procedure
AS00doc032519
1-13
1
3.
Install the upper mount clamp (with small hole) at the top of the sensor. Use two of the
provided 1/4-20 x 3/4” flat socket head bolts to secure a mounting block to the clamp.
Note the orientation of the mount clamp and mounting block. The clamp and block should
be oriented as shown to ensure proper assembly to the sawmill. Use one of the provided
1/4-20 x 1” socket head bolts to secure the clamp to the sensor.
See Figure 1-11.
FIG. 1-11
Upper Mount
Clamp (Note Orientation)
Mounting Block
(Note Orientation)
1/4-20 x 1”
Socket Head Bolt
1/4-20 x 3/4”
Flat Socket Head Bolt (2)
3H0817-3