![Wood-mizer Accuset Скачать руководство пользователя страница 22](http://html1.mh-extra.com/html/wood-mizer/accuset/accuset_safety-operation-maintenance-and-parts-manual_994535022.webp)
Installation Procedure
Wiring Preparation
1
1-18
AS00doc032519
Installation Procedure
See Figure 1-15.
6.
Unbolt and remove the rear power feed panel from the sawmill control box. Leave all
wires connected.
7.
Unbolt and remove the front panel from the control box. Leave all wires connected.
8.
Unbolt and remove the top hinged cover from the control box. Set aside.
9.
Remove the four plug screws and nuts from the top of the control box.
10. Super models only:
Unbolt and remove the up/down solenoid panel from the control
box. Leave all wires connected.
11.
Remove the plug from the 1” diameter hole in the top of the control box.
FIG. 1-15
3H0849-1C
Control Box Cover
Rear Power Feed
Panel (newer Super
models will vary)
Front Control
Panel
Plug
Screws (4)
Up/Down Solenoid
Panel (Super only)
1" Hole Plug