Maintenance
3326
−
2/A1
Winterthur Gas & Diesel Ltd.
Note: During step
), make sure that the
elastic bolts in the connecting rod
align with the holes in the
crosshead pin.
28) Lower carefully the crosshead pin on to
the connecting rod.
29) Remove the tool (94332,
) from
the column and the tool (94337).
30) Remove the tools (94337) from the
connecting rod.
31) Remove all manual ratchets, eye bolts
and the chain block.
32) Remove all protection from the the
openings in the crosshead pin.
33) Do the clearance checks, refer to
.
6.
Completion
1) Install the round nuts to the elastic studs
on the connecting rod, refer to
2) Install the top bearing cover, refer to
.
3) Disengage the turning gear.
4) Set the lubricating oil pump to on.
5) Make sure that the crosshead and the
bottom end bearings of the connecting
rod have sufficient lubrication.
6) Unlock the turning gear.
Crosshead Pin
−
Removal and Installation
2017
H4
H5
H1
WCH00620
94321
I
I
I - I
EB1
EB1
EB2
EB2
94019L
1
94324
3
2
2
II
II
Fig. 11
Содержание X35-B
Страница 12: ...Intentionally blank ...
Страница 14: ...Intentionally blank ...
Страница 16: ...Intentionally blank ...
Страница 34: ...Intentionally blank ...
Страница 58: ...Intentionally blank ...
Страница 60: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 2 6 WCH03791 2017 ...
Страница 61: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 3 6 WCH03791 2017 ...
Страница 62: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 4 6 WCH03791 2017 ...
Страница 63: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 5 6 WCH03791 2017 ...
Страница 64: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 6 6 WCH03791 2017 ...
Страница 68: ...Intentionally blank ...
Страница 72: ...Intentionally blank ...
Страница 82: ...Intentionally blank ...
Страница 85: ...Intentionally blank ...
Страница 92: ...Intentionally blank ...
Страница 96: ...Intentionally blank ...
Страница 112: ...Intentionally blank ...
Страница 120: ...Intentionally blank ...
Страница 124: ...Intentionally blank ...
Страница 138: ...Intentionally blank ...
Страница 154: ...Intentionally blank ...
Страница 168: ...Intentionally blank ...
Страница 180: ...Intentionally blank ...
Страница 182: ...Maintenance 2728 1 A1 Winterthur Gas Diesel Ltd 2 5 6 Lift housing from the valve spindle 4 ...
Страница 186: ...Intentionally blank ...
Страница 190: ......
Страница 204: ...Intentionally blank ...
Страница 211: ...Intentionally blank ...
Страница 216: ...Intentionally blank ...
Страница 224: ...Intentionally blank ...
Страница 228: ......
Страница 229: ...Intentionally blank ...
Страница 264: ...Intentionally blank ...
Страница 270: ...Intentionally blank ...
Страница 280: ...Intentionally blank ...
Страница 294: ...Intentionally blank ...
Страница 298: ...Intentionally blank ...
Страница 302: ...Intentionally blank ...
Страница 318: ...Intentionally blank ...
Страница 328: ...Intentionally blank ...
Страница 344: ...Intentionally blank ...
Страница 368: ...Intentionally blank ...
Страница 374: ...Intentionally blank ...
Страница 380: ...Intentionally blank ...
Страница 396: ...Intentionally blank ...
Страница 407: ...Intentionally blank ...
Страница 426: ...Intentionally blank ...
Страница 442: ...Intentionally blank ...
Страница 444: ...Intentionally blank ...
Страница 546: ...Woodward L Orange GmbH Porschestraße 8 D 70435 Stuttgart Tel 49 711 82609 0 Fax 49 711 82609 61 www lorange com ...