Maintenance
3303
−
4/A2
Winterthur Gas & Diesel Ltd.
Note: During step
), operate the manual
ratchet (H3
) to keep tension
on the chain.
18) Operate the manual ratchet (H4) to
move the connecting rod to the vertical
position.
19) Attach the manual ratchet (H3) to the
tool (94337A) to hold the connecting rod
in the vertical position.
20) Attach the support (94332) to the
column and the tool (94337).
21) Attach the engine room crane (1) /
manual ratchet (H2) to the shackle on
the lifting plate (94324).
22) Operate the engine room crane (1) /
manual ratchet (H2) to lift the crosshead
a small distance.
23) Remove the supports (94322) from the
column.
CAUTION
Damage Hazard: During
), make sure that
the elastic studs are
aligned with the related
holes in the crosshead.
This prevents damage to
equipment.
24) Operate carefully the engine room
crane (9) / manual ratchet (H2) to lower
the crosshead on to the connecting rod.
25) Remove the manual ratchets (H2,H3,
H4) and the engine room crane.
26) Remove the tools (94337, 94337A and
94332).
27) Remove the lifting plate (94324).
28) Remove the eye bolt (94045
−
M30) and
the stop plate 94335).
29) Attach the four round nuts (2) to the
elastic studs, refer to
Removal and Installation
Piston Removed
2017
Fig. 13
WCH00574
H3
H4
94337A
H2
1
WCH00575
94322
94337
94332
WCH00575
94335
94045
−
M30
94324
2
Содержание X35-B
Страница 12: ...Intentionally blank ...
Страница 14: ...Intentionally blank ...
Страница 16: ...Intentionally blank ...
Страница 34: ...Intentionally blank ...
Страница 58: ...Intentionally blank ...
Страница 60: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 2 6 WCH03791 2017 ...
Страница 61: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 3 6 WCH03791 2017 ...
Страница 62: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 4 6 WCH03791 2017 ...
Страница 63: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 5 6 WCH03791 2017 ...
Страница 64: ...Maintenance 0352 1 A1 Winterthur Gas Diesel Ltd 6 6 WCH03791 2017 ...
Страница 68: ...Intentionally blank ...
Страница 72: ...Intentionally blank ...
Страница 82: ...Intentionally blank ...
Страница 85: ...Intentionally blank ...
Страница 92: ...Intentionally blank ...
Страница 96: ...Intentionally blank ...
Страница 112: ...Intentionally blank ...
Страница 120: ...Intentionally blank ...
Страница 124: ...Intentionally blank ...
Страница 138: ...Intentionally blank ...
Страница 154: ...Intentionally blank ...
Страница 168: ...Intentionally blank ...
Страница 180: ...Intentionally blank ...
Страница 182: ...Maintenance 2728 1 A1 Winterthur Gas Diesel Ltd 2 5 6 Lift housing from the valve spindle 4 ...
Страница 186: ...Intentionally blank ...
Страница 190: ......
Страница 204: ...Intentionally blank ...
Страница 211: ...Intentionally blank ...
Страница 216: ...Intentionally blank ...
Страница 224: ...Intentionally blank ...
Страница 228: ......
Страница 229: ...Intentionally blank ...
Страница 264: ...Intentionally blank ...
Страница 270: ...Intentionally blank ...
Страница 280: ...Intentionally blank ...
Страница 294: ...Intentionally blank ...
Страница 298: ...Intentionally blank ...
Страница 302: ...Intentionally blank ...
Страница 318: ...Intentionally blank ...
Страница 328: ...Intentionally blank ...
Страница 344: ...Intentionally blank ...
Страница 368: ...Intentionally blank ...
Страница 374: ...Intentionally blank ...
Страница 380: ...Intentionally blank ...
Страница 396: ...Intentionally blank ...
Страница 407: ...Intentionally blank ...
Страница 426: ...Intentionally blank ...
Страница 442: ...Intentionally blank ...
Страница 444: ...Intentionally blank ...
Страница 546: ...Woodward L Orange GmbH Porschestraße 8 D 70435 Stuttgart Tel 49 711 82609 0 Fax 49 711 82609 61 www lorange com ...