Service Manual
Disassembly and reassembly
41
Removing the NIBP assembly from the main board
This procedure consists of 3 parts:
•
Part 1: Removing the Tubing
•
Part 2: Removing the Pump
•
Part 3: Removing the Valve Assembly
. Depending on what you are replacing, do one of the following:
•
Part 1
•
Parts 1 and 2
•
Parts 1 and 2 and 3
NIBP disassembly, part 1: Removing the tubing
1.
“Removing the lithium ion battery assembly”
2.
“Separating the top and bottom chassis halves”
3.
“Removing the main board from the bottom chassis assembly”
\
4.
Disconnect the two tubing sections from the pump.
WARNING
After replacing
any part
of the NIBP assembly, you must
characterize NIBP. Failure to characterize NIBP could lead to excessive cuff
pressure for neonatal patients.
Caution
Use extra care when handling the tubing. The tubing, especially at the
joints, is very fragile.
•
Never use sharp-edged tools to grip or remove the tubing.
•
Always grip the tubing as close as possible to the point of contact with the
connector.
Pump
Valve assembly
Tubing
Pressure transducers
Содержание Propaq LT 802LT0N
Страница 1: ...Propaq LT Vital Signs Monitor Service Manual Software version 1 5X or later ...
Страница 4: ...iv Contents Welch Allyn Propaq LT Vital Signs Monitor ...
Страница 8: ...4 Safety summary Welch Allyn Propaq LT Vital Signs Monitor ...
Страница 28: ...24 Troubleshooting and repair Welch Allyn Propaq LT Vital Signs Monitor ...
Страница 74: ...70 Functional verification Welch Allyn Propaq LT Vital Signs Monitor ...
Страница 78: ...74 35 ml test volume Welch Allyn Propaq LT Vital Signs Monitor ...