42
Disassembly and reassembly
Welch Allyn Propaq LT Vital Signs Monitor
REASSEMBLY:
The pump input (suction) port is slotted and is oriented away from the main board. The
output port (pressure) is not slotted and is oriented toward the main board.
5.
Disconnect and set aside the three tubing assemblies.
NIBP disassembly, part 2: Removing the pump
6.
Note the relative positions of the pump, the pump wires, and the cable ties securing
the pump.
Input (smaller hole, with slot)
Output (larger hole, without slot)
Input (to smaller hole,
with slot)
Output (to larger hole,
without slot)
Содержание Propaq LT 802LT0N
Страница 1: ...Propaq LT Vital Signs Monitor Service Manual Software version 1 5X or later ...
Страница 4: ...iv Contents Welch Allyn Propaq LT Vital Signs Monitor ...
Страница 8: ...4 Safety summary Welch Allyn Propaq LT Vital Signs Monitor ...
Страница 28: ...24 Troubleshooting and repair Welch Allyn Propaq LT Vital Signs Monitor ...
Страница 74: ...70 Functional verification Welch Allyn Propaq LT Vital Signs Monitor ...
Страница 78: ...74 35 ml test volume Welch Allyn Propaq LT Vital Signs Monitor ...