36
Disassembly and reassembly
Welch Allyn Propaq LT Vital Signs Monitor
Removing the main board from the bottom chassis assembly
1.
“Removing the lithium ion battery assembly”
2.
“Separating the top and bottom chassis halves”
3.
Disconnect the power/USB flex cable from the main board connector (P2).
4.
Remove the four screws holding the main board to the bottom chassis.
Caution
Do not touch, move, or adjust the radio antenna. The radio antenna is
extremely fragile and is exposed during this procedure. If the antenna is
damaged, the monitor must be returned to a Welch Allyn authorized Service
Center for repair.
Power/USB cable
Ferrite bead
Содержание Propaq LT 802LT0N
Страница 1: ...Propaq LT Vital Signs Monitor Service Manual Software version 1 5X or later ...
Страница 4: ...iv Contents Welch Allyn Propaq LT Vital Signs Monitor ...
Страница 8: ...4 Safety summary Welch Allyn Propaq LT Vital Signs Monitor ...
Страница 28: ...24 Troubleshooting and repair Welch Allyn Propaq LT Vital Signs Monitor ...
Страница 74: ...70 Functional verification Welch Allyn Propaq LT Vital Signs Monitor ...
Страница 78: ...74 35 ml test volume Welch Allyn Propaq LT Vital Signs Monitor ...