![Welbilt Merrychef 32Z3923 Скачать руководство пользователя страница 76](http://html1.mh-extra.com/html/welbilt/merrychef-32z3923/merrychef-32z3923_service-and-repair-manual_953836076.webp)
Merrychef eikon
®
e2s service and repair manual
76
_______________________________________________________________________________________________________________________________
_______________________________________________________________________________________________________________________________
6 Replacing components
Back to contents >
NOTICE: When detaching the cooling duct be careful not to damage the exhaust pipe leading into the duct, the cavity
overheat thermostat or the LV transformer
If removing the cooling duct from the oven the cavity overheat thermostat should be disconnected from the bracket using a
14mm socket or spanner and the wires should be disconnected
5.
Disconnect the wiring from the magnetron(s)
7.
Remove the magnetron overheat thermostat(s) for refitment on to the replacement magnetron(s).
Fitting a magnetron
•
Follow the steps in the reverse order to fit a replacement magnetron.
•
Ensure the magnetron overheat thermostat is refitted in the same location to ensure correct operation.
•
Ensure the RF (Radio Frequency) gasket is correctly seated.
•
Fit all of the M8 bolts loosely, then tighten in a cross pattern to ensure the magnetron seats evenly.
WARNING
Ensure nothing becomes trapped under the magnetron mounting points (e. g. insulation material) while fitting the
magnetron. This can lead to microwave leakage.
NOTICE:
If the electric connections have not been restored properly this may lead to malfunction/damage of the oven.
6.7
Replacing the cooling fan
Component
Tools required
M7 hex socket wrench
Discharge Tool
6.
Unfasten the four M8
hex cap bolts to remove
the magnetron. There is
one pair of bolts on
each side of the
magnetron. Disconnect
any cables leading into
the magnetron(s).
The cooling fan is
located under cavity
and can be accessed
by removing the
convection fan motor
speed controller.
Requirements
Check that the following requirements have been met:
§
The appliance has been disconnected from the power
supply and protective measures have been taken to
ensure the power cannot be switched on again.
§
The appliance is cool.
§
The top, left and right panels of the casing of the
appliance have been removed.
§
The cooling fan speed controller is removed.
§
The high voltage capacitors are discharged before
commencing work. Discharge cap with discharge tool
across both pins on the 3 pin Molex connector.