B-10 External Connections
.
1. Place the pump on the floor, within 1.5 m (5 feet) of the instrument.
2. Attach the NW25/NW40 adaptor to the roughing pump inlet flange
using an NW40 center ring, and then secure the connection with an
NW40 clamp, using the 7-mm nut driver to install the clamp.
3. Attach the NW25 tee to the NW25/NW40 adaptor using an NW25 center
ring, and then secure the connection with an NW25 clamp, using the
7-mm nut driver to install the clamp.
4. Using the NW25 center rings and clamp, and the 7-mm nut driver,
attach the flanged end of a length of 1-inch ID vacuum hose to the top
port on the NW25 tee, and the 10-mm reducer fitting and a length of
10-mm ID nylon tubing to the middle (perpendicular) port on the tee.
5. Using 2 hose clamps, connect the opposite end of the length of 1-inch
vacuum hose in
to the 1-inch OD straight vacuum port on the
instrument’s rear panel.
6. Connect the opposite end of the 10-mm nylon tube to the 10-mm source
vent port on the instrument’s rear panel.
7. Using 1 hose clamp, connect a length of 12.7-mm clear PVC exhaust
tubing to the roughing pump exhaust port NW25 nozzle fitting.
8. Route the open end of the exhaust tubing to a suitable exhaust vent.
9. Make the electrical connections to the roughing pump (see
Warning:
The roughing pump is heavy. To avoid injury, at least
two people must lift the pump.
Caution:
To avoid gas leaks, use the sharp knife to cut the PVC
exhaust tubing squarely (that is, perpendicular to its horizontal
axis).
Caution:
The instrument requires two separate exhaust systems:
one for nitrogen, the other for the roughing pump. Vent them to
atmosphere through separate exhaust lines. Your warranty does
not cover damage caused by routing exhaust lines incorrectly.
Содержание Xevo TQD
Страница 12: ...xii...
Страница 20: ...xx Table of Contents...
Страница 23: ...Uses and compatibility 1 3 Xevo TQD TP03406...
Страница 24: ...1 4 Specifications and Operating Modes Xevo TQD with visor up TP03407...
Страница 42: ...1 22 Specifications and Operating Modes...
Страница 52: ...2 10 Preparing for Operation...
Страница 76: ...3 24 Changing the Mode of Operation...
Страница 194: ...4 118 Maintenance Procedures...
Страница 208: ...A 14 Safety Advisories...
Страница 234: ...B 26 External Connections...
Страница 238: ...C 4 Materials of Construction and Compliant Solvents...
Страница 250: ...Index 8...