4-18
Maintenance Procedures
To open the source isolation valve after completing a maintenance
procedure:
1. Open the source isolation valve by moving its handle clockwise to the
horizontal position.
2. Close the source enclosure.
Warning:
The source components can be contaminated with
biohazardous and/or toxic materials. Always wear
chemical-resistant, powder-free gloves while performing this
procedure.
Warning:
To avoid puncture wounds, take great care while working with
the source enclosure open if one or both of these conditions apply:
• An ESI probe is fitted (the probe tip is sharp).
• A corona pin is fitted (the pin tip is sharp).
TP03130
Isolation valve handle
in open position
Содержание Xevo TQD
Страница 12: ...xii...
Страница 20: ...xx Table of Contents...
Страница 23: ...Uses and compatibility 1 3 Xevo TQD TP03406...
Страница 24: ...1 4 Specifications and Operating Modes Xevo TQD with visor up TP03407...
Страница 42: ...1 22 Specifications and Operating Modes...
Страница 52: ...2 10 Preparing for Operation...
Страница 76: ...3 24 Changing the Mode of Operation...
Страница 194: ...4 118 Maintenance Procedures...
Страница 208: ...A 14 Safety Advisories...
Страница 234: ...B 26 External Connections...
Страница 238: ...C 4 Materials of Construction and Compliant Solvents...
Страница 250: ...Index 8...