B-6
External Connections
8. Route the open end of the exhaust tubing to a suitable exhaust vent.
9. Check the oil level in the pump (see “Checking the roughing pump oil
level” on
, and, if needed, “Adding oil to the roughing pump” on
).
10. Make the electrical connections to the roughing pump (see
).
Caution:
The instrument requires two separate exhaust systems:
one for nitrogen, the other for the roughing pump. Vent them to
atmosphere through separate exhaust lines. Oil mist can severely
damage the instrument if the nitrogen exhaust line connects with
the roughing pump exhaust line. Your warranty does not cover
damage caused by routing exhaust lines incorrectly.
Caution:
To ensure correct operation of the roughing pump, do not
operate the pump with the oil level at less than 30% of the MAX
level.
Содержание Xevo TQD
Страница 12: ...xii...
Страница 20: ...xx Table of Contents...
Страница 23: ...Uses and compatibility 1 3 Xevo TQD TP03406...
Страница 24: ...1 4 Specifications and Operating Modes Xevo TQD with visor up TP03407...
Страница 42: ...1 22 Specifications and Operating Modes...
Страница 52: ...2 10 Preparing for Operation...
Страница 76: ...3 24 Changing the Mode of Operation...
Страница 194: ...4 118 Maintenance Procedures...
Страница 208: ...A 14 Safety Advisories...
Страница 234: ...B 26 External Connections...
Страница 238: ...C 4 Materials of Construction and Compliant Solvents...
Страница 250: ...Index 8...