36.
Replace UV Lamp –
See separate section in this manual for directions on how to Replace the
UV Lamp.
37.
Re-fit the top cover and insert the two screws at the rear of the machine that secure it
38.
Turn on the water supply at the isolation point
39.
Reconnect the power lead and insert it into the rear of the
machine. Turn on the Red Power Switch.
40.
Taste the water one final time, if you detect any hint of taste, flush 3 more gallons of water to
further flush the
Cube.
41.
Check the machine is heating and cooling the water by dispensing some hot and cold water
and checking the temperatures.
CUBE
Operating, Installation, and Service Manual
Page 34 - Revision: 6-23-2015
Содержание WL Cube
Страница 11: ...CUBE FLOW DIAGRAM CUBE Operating Installation and Service Manual Page 11 Revision 6 23 2015...
Страница 16: ...PCB LED CODES CUBE Operating Installation and Service Manual Page 16 Revision 6 23 2015...
Страница 53: ...CUBE MAIN DRAWING AND PARTS LIST CUBE Operating Installation and Service Manual Page 53 Revision 6 23 2015...
Страница 56: ...CUBE PARTS DRAWING AND PARTS LIST CUBE Operating Installation and Service Manual Page 56 Revision 6 23 2015...