1.
Attach the water supply line to the 1/4” feed water inlet bulkhead fitting on the back of the unit.
Waterlogic
requires the use of a water pressure regulator. Water feed pressure must be between
40-60 psi. Turn on the water supply and check all of the connections for leaks.
2.
Connect the power cord to the back of the
Waterlogic CUBE
and to a 120 Volt supply.
3.
Turn the Red Power Switch to I=ON position.
4.
The unit will now run through a self-test cycle. Once the self-test cycle has
completed the icon will stop flashing.
5.
Place a container in the dispense area for flushing process. The filter will
now need to be flushed.
6.
Check to ensure that both the red and green power switches are in the
O=OFF position.
NOTE:
Switches have internal LED that illuminates when placed in I=ON
position.
CAUTION!
NEVER TURN ON HEATER BEFORE FILLING HOT TANK.
Green Compressor/Heater Switch must be in the O=OFF position while the hot tank is empty.
Damage could occur within one minute and the overload (high limit) will require manual reset if
heater is turned on with an empty hot tank.
7.
Select the Ambient Water Icon followed by the main dispensing button, dispense 10 liters of water.
This will remove excess carbon fines and sufficiently generate the filter.
8.
Prime the Hot Tank. Holding a container under the dispensing faucet, press the hot button until it
lights up. While the hot water icon is lit, select and hold the central dispense button until a
continuous flow of water is obtained (this could take 2 to 4 minutes). Once a continuous flow is
obtained, flush 5 liters of water by continuing to hold the hot button. Hot Tank is now full.
CUBE
Operating, Installation, and Service Manual
Page 26 - Revision: 6-23-2015
Содержание WL Cube
Страница 11: ...CUBE FLOW DIAGRAM CUBE Operating Installation and Service Manual Page 11 Revision 6 23 2015...
Страница 16: ...PCB LED CODES CUBE Operating Installation and Service Manual Page 16 Revision 6 23 2015...
Страница 53: ...CUBE MAIN DRAWING AND PARTS LIST CUBE Operating Installation and Service Manual Page 53 Revision 6 23 2015...
Страница 56: ...CUBE PARTS DRAWING AND PARTS LIST CUBE Operating Installation and Service Manual Page 56 Revision 6 23 2015...