7.
Reconnect the power lead into the back of the machine
and plug in to power source.
8.
Visually verify that the UV Lamp is working correctly by
checking the PCB LED. There should be no warning icons
flashing.
9.
Turn on Red Power Switch to the On Position
I = On
10.
Visually verify that the UV Lamp is working correctly by
checking the PCB LED. There should be no warning icons
flashing.
CUBE
Operating, Installation, and Service Manual
Page 40 - Revision: 6-23-2015
Содержание WL Cube
Страница 11: ...CUBE FLOW DIAGRAM CUBE Operating Installation and Service Manual Page 11 Revision 6 23 2015...
Страница 16: ...PCB LED CODES CUBE Operating Installation and Service Manual Page 16 Revision 6 23 2015...
Страница 53: ...CUBE MAIN DRAWING AND PARTS LIST CUBE Operating Installation and Service Manual Page 53 Revision 6 23 2015...
Страница 56: ...CUBE PARTS DRAWING AND PARTS LIST CUBE Operating Installation and Service Manual Page 56 Revision 6 23 2015...