HOT TANK ENABLING PROCEDURE
During Initial Installation or anytime the unit loses power, you must follow the Hot Tank Enabling
Procedure.
1.
Plug in power cord to 15 amp 120VAC / 60Hz supply (GFCI recommended).
2.
Turn the Red Power Switch on back of Cube. I=ON
3.
Ensure green heater / compression switch is in the O=OFF.
4.
Press the Hot Select Icon for 2 seconds until it illuminates.
5.
Press the dispense button continuously for a minimum of 10 seconds. The dispense backlight will
turn Red indicating Hot Water.
6.
Always continue to dispense until water comes out the faucet to ensure the hot tank is full before
turning on the heater circuit.
7.
Turn on the Green Heater/Compression switch. Green switch into
the (I) position and the switch illuminates.
This ensures the Hot Water is full of water before the Heat Circuit will
enable.
CAUTION!
NEVER TURN ON HEATER BEFORE FILLING HOT TANK.
Green Compressor/Heater Switch must be in the O=OFF position while the hot tank is empty.
Damage could occur within one minute and the overload (high limit) will require manual reset if
heater is turned on with an empty hot tank.
CUBE
Operating, Installation, and Service Manual
Page 28 - Revision: 6-23-2015
Содержание WL Cube
Страница 11: ...CUBE FLOW DIAGRAM CUBE Operating Installation and Service Manual Page 11 Revision 6 23 2015...
Страница 16: ...PCB LED CODES CUBE Operating Installation and Service Manual Page 16 Revision 6 23 2015...
Страница 53: ...CUBE MAIN DRAWING AND PARTS LIST CUBE Operating Installation and Service Manual Page 53 Revision 6 23 2015...
Страница 56: ...CUBE PARTS DRAWING AND PARTS LIST CUBE Operating Installation and Service Manual Page 56 Revision 6 23 2015...