![background image](http://html1.mh-extra.com/html/waterlogic/wl-cube/wl-cube_operating-installation-and-service-manual_3642828023.webp)
27.
Unscrew the filter body from the filter head by turning the
base in an anti-clockwise direction.
28.
Pour away the excess water.
29.
Remove the new filter cartridge from the packaging and fit it by firmly
pushing it into the filter head, making sure it is firmly and securely fitted.
30.
The sanitization process for the Cold Circuits is now complete.
CUBE
Operating, Installation, and Service Manual
Page 23 - Revision: 6-23-2015
Содержание WL Cube
Страница 11: ...CUBE FLOW DIAGRAM CUBE Operating Installation and Service Manual Page 11 Revision 6 23 2015...
Страница 16: ...PCB LED CODES CUBE Operating Installation and Service Manual Page 16 Revision 6 23 2015...
Страница 53: ...CUBE MAIN DRAWING AND PARTS LIST CUBE Operating Installation and Service Manual Page 53 Revision 6 23 2015...
Страница 56: ...CUBE PARTS DRAWING AND PARTS LIST CUBE Operating Installation and Service Manual Page 56 Revision 6 23 2015...