750-325 CC-Link Fieldbus Coupler
Manual
Version 2.0.1
8
Commissioning
This section shows a step-by-step procedure for starting up exemplarily a WAGO
fieldbus node.
Exemplary Example!
This description is exemplary and is limited here to the execution of a start-up of
one individual fieldbus node with Your control system.
For start-up, different steps are necessary.
•
Connecting Fieldbus Node
•
Setting and Starting Fieldbus Coupler
•
Testing the Function of the Fieldbus Node
In order to be able to communicate in a CC-Link network, further preparations are
necessary.
•
Import „CSP
+
“-File in Configuration Software
•
Implement minimal CC-Link Master Application
The description of these work steps can be found in the corresponding following
sections.
Following the commissioning descriptions after which the fieldbus node is ready
for communication, the following topic is described:
•
Restoring factory settings