![Wacker Neuson Cub 200 Скачать руководство пользователя страница 32](http://html1.mh-extra.com/html/wacker-neuson/cub-200/cub-200_repair-manual_3123718032.webp)
Troubleshooting the Blower
Cub 200/300
32
ghi_tx001207gb.fm
Continued from the previous page.
5. Measure the voltage between terminal
M8
and terminal
M11
on the control
board.
Is 108–132 VAC measured?
6. Measure the voltage between terminal
M15
and terminal
M14
.
Is 108–132 VAC measured?
Result
The power to and from the control board has now been checked.
If the problem has not been resolved, leave the machine disassembled and
continue with the next topic. Otherwise, reassemble the machine.
Yes ____
No ____
Continue.
Disconnect the power supply. Check the function of the ON-OFF
switch and the wiring to the ON-OFF switch.
Yes ____
No ____
The power to and from the control board is
OK.
The control board has failed. Disconnect
the power supply and replace the control
board.
Содержание Cub 200
Страница 1: ...Repair Manual Indirect Fired Air Heater Cub 200 Cub 300 0179422en 001 1009 0 1 7 9 4 2 2 E N...
Страница 4: ...Foreword Cub 200 300 ghi_tx001204gb fm 4...
Страница 15: ...Cub 200 300 Operation ghi_tx001205gb fm 15 Notes...
Страница 59: ...Cub 200 300 Schematic ghi_tx001210gb fm 59 7 Schematic 7 1 Cub 200 Cub 300 Schematic...
Страница 64: ...Ground Heaters Inc 1271 Judson Road Spring Lake MI 49456 Tel 231 799 9600 Fax 231 799 9500 Tel 877 799 9600...