![Wacker Neuson Cub 200 Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/wacker-neuson/cub-200/cub-200_repair-manual_3123718014.webp)
Operation
Cub 200/300
ghi_tx001205gb.fm
14
2.3
Starting/Stopping the Machine
If not using the remote thermostat
Turning ON
1. Move the power switch
(c)
to the ON “I” position.
The blower will turn on immediately.
The burner will go through a prepurge cycle and then
ignite.
The burner will continue to fire and the blower will con-
tinue to operate until the machine is turned off.
Turning OFF
2. Move the power switch to the OFF position.
The burner will shut down.
The blower will continue to operate for approximately
two minutes to allow the combustion chamber to cool.
If using the remote thermostat
Turning ON
1. Connect the remote thermostat to the control panel at the
remote thermostat receptacle
(a)
.
2. Place the remote thermostat in the area to be heated. Set it
to the desired temperature.
3. Move the power switch
(c)
to the ON “I” position.
The blower will turn on immediately.
The burner will go through a prepurge cycle and then
light.
The burner will continue to fire until the temperature of
the space being heated reaches the temperature set by
the thermostat. At that time, the burner shuts down but
the blower will remain on.
Turning OFF
4. Move the power switch to the OFF position.
The burner will shut down.
The blower will continue to operate for approximately
two minutes to allow the combustion chamber to cool.
Содержание Cub 200
Страница 1: ...Repair Manual Indirect Fired Air Heater Cub 200 Cub 300 0179422en 001 1009 0 1 7 9 4 2 2 E N...
Страница 4: ...Foreword Cub 200 300 ghi_tx001204gb fm 4...
Страница 15: ...Cub 200 300 Operation ghi_tx001205gb fm 15 Notes...
Страница 59: ...Cub 200 300 Schematic ghi_tx001210gb fm 59 7 Schematic 7 1 Cub 200 Cub 300 Schematic...
Страница 64: ...Ground Heaters Inc 1271 Judson Road Spring Lake MI 49456 Tel 231 799 9600 Fax 231 799 9500 Tel 877 799 9600...