![Wacker Neuson Cub 200 Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/wacker-neuson/cub-200/cub-200_repair-manual_3123718020.webp)
Burner Setup
Cub 200/300
20
ghi_tx001317gb.fm
Continued from the previous page.
8. Analyze the combustion. Follow the combustion analyzer manufacturer’s
instructions and the general guidelines below.
Use the access hole in the exhaust stack.
Take several samples as the heater warms.
Take the final sample just before the heater reaches 71°C (160°F).
9. Re-adjust the air band, if necessary, until the smoke spot test and combustion
analysis are within the following parameters:
O
2
content: 3–5%
Smoke spot: less than 1
Result
The burner has now been set.
Содержание Cub 200
Страница 1: ...Repair Manual Indirect Fired Air Heater Cub 200 Cub 300 0179422en 001 1009 0 1 7 9 4 2 2 E N...
Страница 4: ...Foreword Cub 200 300 ghi_tx001204gb fm 4...
Страница 15: ...Cub 200 300 Operation ghi_tx001205gb fm 15 Notes...
Страница 59: ...Cub 200 300 Schematic ghi_tx001210gb fm 59 7 Schematic 7 1 Cub 200 Cub 300 Schematic...
Страница 64: ...Ground Heaters Inc 1271 Judson Road Spring Lake MI 49456 Tel 231 799 9600 Fax 231 799 9500 Tel 877 799 9600...