Installation Instructions
Page 35
Snapshot of Site Requirements, continued…
Vent Stack Installation Requirements
•
The GREEN MACHINE may be installed elevated on the existing vent risers provided there
is an existing structure that can support the weight of the GREEN MACHINE, or a structure
can be installed to support the weight of the GREEN MACHINE.
•
Due to a variety of construction designs, VST cannot recommend how the GREEN
MACHINE should be installed or mounted on a vent riser support structure; however, the
structure that supports the GREEN MACHINE must be designed and installed at a height
allowing the piping inlet and outlets to connect to the existing vent risers.
•
The GREEN MACHINE has
24”
legs that can be bolted on the base, but the legs may be
removed for the GREEN MACHINE to be secured to a steel support structure.
•
A new air outlet vent riser connected to the GREEN MACHINE must be installed to release
air to the atmosphere.
•
All safety and code concerns must be taken into consideration prior to vent stack mount
installation.
•
A Design Engineer is responsible for designing the support structure, support base, all
required hardware and bolting connections, and the support structure foundation to meet
all regulatory specifications that may be required by local jurisdictions.
1.15
Other Information to Document
1.15.1
Gasoline Stations
1.
Monthly throughput (gallons)
2.
Hours open (example: 9am-11pm or 24 hrs.)
3.
Number of Underground Storage Tanks
4.
Size of Underground Storage Tanks (gallons)