4.5 - GREEN MACHINE
™
- North America - Installation, Operation, Maintenance, & Troubleshooting Manual
Chapter 1: GREEN MACHINE
™
Installation
Page 23
1.4
GREEN MACHINE Dimensions & Weight
Unit
Dimensions
Weight
GREEN MACHINE
L-
39” x W
-
27” x H
-49.89
”
Height includes
24”
legs
227 lbs.
w/out Cover
w/out Control Panel
Aluminum Cover
L-
39” x W
-
27” x H
-
25”
(one-piece unit)
24 lbs.
VST Control Panel
L-
14” x W
-
12” x H
-
8”
22 lbs.
1.5
Ground Mount Locations
•
NOTE: Minimum vapor-piping slope must always be maintained for all GREEN MACHINE
mounting options.
•
VST requires a minimum slope of ¼” per foot on all vapor piping away from the
GREEN MACHINE to the vent risers.
•
Select a location for the concrete pad as close as possible to the vent risers to
minimize piping and pressure drop.
•
The GREEN MACHINE must be protected from damage:
•
Install bollards or another suitable method to protect the GREEN MACHINE.
•
VST recommends a clear 18
”
perimeter around the GREEN MACHINE for maintenance and
testing.
•
The GREEN MACHINE must be located within 100 feet of the vent risers.
•
To minimize the installation cost and to maximize operating efficiency, locate the GREEN
MACHINE adjacent to the existing vent risers.
•
A new air outlet vent riser connected to the GREEN MACHINE must be installed to release
air to the atmosphere.
•
VST recommends setting the GREEN MACHINE on a concrete pad with the following
minimum dimensions: 42” long x 30” wide, 6” thick.
•
Install the concrete pad as outlined in this manual.
•
F
ollow the local jurisdiction’s building codes.
•
VST does not provide any hardware to install the GREEN MACHINE on the pad.