4.5 - GREEN MACHINE
™
- North America - Installation, Operation, Maintenance, & Troubleshooting Manual
Chapter 9: Replacement Procedures
Page 191
Leak Test Procedure, continued…
12.
After the Leak Test 30-minute timer expires and the test is complete:
1.
The GREEN MACHINE Controller will show the Maintenance Screen where
the GREEN MACHINE is in the Manual OFF mode and will not operate.
2.
Remove the nitrogen from the Leak Test Fixture.
3.
Remove the Leak Test Fixture from the GREEN MACHINE.
4.
Re-install the cap in the tee.
5.
CAUTION: Make sure the 3-way valve below the Pressure Sensor is turned
VERTICAL (ON or Open). Leaving the 3-way valve turned OFF
(HORIZONTAL) will not allow the GREEN MACHINE to operate in the
Normal Operating Mode.
6.
Put the cover back on the GREEN MACHINE and lock the hasps.
7.
Open the 3 ball valves at the GREEN MACHINE and place the locks on the
valves.
8.
At the GREEN MACHINE Controller, push the ESC button to return to the
Main Screen where the GREEN MACHINE will go into a Normal Operating
Mode.
CAUTION: DO NOT PUSH THE ESC BUTTON UNTIL THE BALL VALVES BETWEEN THE
GREEN MACHINE AND THE VENT RISERS ARE OPENED. PUSHING THE ESC BUTTON
WHEN THE VALVES ARE CLOSED WILL NOT ALLOW THE GREEN MACHINE TO
OPERATE PROPERLY AND MAY CAUSE DAMAGE TO INTERNAL COMPONENTS.
Figure 9-39: GREEN MACHINE Vapor Inlet, Return, and Air Outlet Connections