S E C T I O N 5 – R E P L A C I N G C O M P O N E N T S
CAFFÈ MIO – OPERATION AND SERVICE
Page 48 of 110
R e p l a c i n g M a j o r C o m p o n e n t s
5.
Place the new brewer onto the brewer bracket.
a)
Make sure that the brew chamber is open.
b)
Make sure that the brewer drive pin aligns with the coupling on the brewer motor.
c)
Gently grasp the brewer, with one hand on the top, and the other hand on the bottom.
d)
Align the rear support of the brewer with the flange at the rear of the brewer bracket.
e)
Push the brewer into place to engage the brewer drive pin with the slot in the motor coupling.
If it does not align, move the brewer crank arm slightly until you feel the brewer engaging
with the motor coupling.
f)
Once engaged, move the brewer slightly to the left until it is behind the left support.
6.
Engage the lock pin.
a)
Release the lock pin from under the front flange and engage it with the hole located on the
front left side of the brewer. The brewer should now be firmly in place.
Locked
Position
Unlocked
Position
Brewer Drive Pin
Motor Coupling
Location Flange
Rear Support