64
PCB 3 (sensor PCB LP3)
X1
X2
6
10
19
27
F23
27
5
4
3
2
1
4
3
2
1
F22
F21
F20
F19
F18
F23
F22
F21
F20
The terminals of PCB 3 (sensors and KM
BUS) are designated as follows:
Example: Terminal
3X2.10
3
PCB 3 (LP3)
X2. Terminal strip 2
10 Terminal 10
Connection options on PCB 3 (LP3)
■ Terminals 3X1.1 to 3X1.27
■ Terminals 3X2.1 to 3X2.27
■ Sensor terminals F0 to F23
Note
The consecutive numbers of the termi-
nals are not the same as the sensor des-
ignation.
Inserting cables/leads
When routing on-site cables/leads, observe the location of the cable entries into the
appliance on its back (see page 11).
Installation sequence
Overview of power connections
(cont.)
5368 522 UAE
Содержание Vitocal 300-G BW
Страница 57: ...57 6 1 2 4 3 5 A 5x Installation sequence Opening the heat pump 5368 522 UAE Installation...
Страница 188: ...188 VITOCAL 300 205 025 011 203 202 200 206 207 204 201 010 025 A 026 Parts lists Parts lists type BWC cont 5368 522 UAE...
Страница 194: ...194 VITOCAL 300 205 203 202 200 206 207 204 201 010 026 025 A 025 Parts lists Parts lists type BW cont 5368 522 UAE...
Страница 213: ...213 5368 522 UAE...
Страница 214: ...214 5368 522 UAE...
Страница 215: ...215 5368 522 UAE...